Project Name
|
Project Location |
Date |
|
|
| Wilson Junior/Senior High School
Gymnasium Addition*
Produced
schematic design and construction documents for a new gymnasium and
locker room facility. Work performed on behalf of Duchscherer
Oberst Design.
|
Wilson,
NY
|
1994
|

|
| Wilson Junior/Senior High School
12-Classroom Addition*
Produced
schematic design and construction documents for a new 12-classroom
addition and entry. Work performed on behalf of Duchscherer
Oberst
Design.
|
Wilson,
NY |
1994 |
|
| New
Student
Meeting Hall; SUNY at Buffalo
Schematic design for a new
centrally-planned meeting hall. Capacity: 150 students. Not Built.
|
Buffalo, NY |
1992
|
|
| The
School of Architecture & Planning; SUNY at Buffalo
Schematic
design for a new school of Architecture and Planning to be located
adjacent to and within the exisitng Guaranty Building, a Louis Sullivan
National Historic landmark building. Not Built.
|
Buffalo, NY |
2005
|

|
NSNT Academic Village Residence
Hall; Pitt Greensburg*
Project
designer, architect and manager. Provided design, construction
documents, and project management for a 96-bed student residence
hall. Work completed on behalf of Renaissance 3 Architects.
|
Greensburg, PA |
2003 |


|
Chambers Hall Dining
Facility; Pitt
Greensburg*
Project
manager. Provided project management for an expansion to the
existing
hall. Work completed on behalf of Renaissance 3 Architects.
|
Greensburg, PA |
2003 |



|
Upper Campus Housing; University
of Pittsburgh*
Project designer. Produced
numerous schematic designs and a feasibility
study for multiple student residence halls located in the upper campus
of the University of Pittsburgh's Oakland campus. The study
included exploration
of various building designs, landscape designs, and orientations of
building designs on the chosen sites. Work completed on behalf of
Renaissance 3 Architects.
|
Pittsburgh, PA |
2002 |

|
Allegheny Middle School;
Pittsburgh Public Schools*
Provided construction drawings for renovations to the
existing building. Work completed on behalf of Renaissance 3
Architects.
|
Pittsburgh, PA |
2003
|
|
Palisano Hall; Canisius College*
Produced construction
documents for a university student residence hall and dining
pavilion. Work completed on behalf of Foit-Albert Architects.
|
Buffalo, NY |
1996
|
|
Smallwood
Elementary School; Amherst Central*
Produced
construction
documents for a elementary classroom addition. Work completed on
behalf of Duchscherer Oberst Design.
|
Amherst, NY
|
1994
|
|
Windermere
Elementary School; Amherst Central*
Produced
construction
documents for a elementary classroom addition. Work completed on
behalf of Duchscherer Oberst Design.
|
Amherst, NY
|
1994 |
|
Business
and Commerce Center; Daeman College*
Produced
schematic design models and construction
documents for a university business and commerce center. Work
completed on behalf of Duchscherer Oberst Design.
|
Amherst, NY
|
1993 |

|
Drake Library Pedestrian
Bridge; SUNY College at Brockport*
Produced
construction
documents for a pedestrian bridge linking two sides of a university
campus divided by a railroad line. Work completed on behalf of
Foit-Albert Architects.
|
Brockport, NY |
1996 |

|
Accessibility
Upgrades; SUNY College at Brockport*
|
Brockport, NY |
1996 |
|
Accessibility
Upgrades; SUNY
Buffalo State College*
|
Buffalo, NY |
1997 |
|
The
Cantalician Center*
|
Amherst, NY |
1996 |
|
Residence Hall
Renovations; Edinboro
University*
|
Edinboro, PA |
2003 |
|